game

Home / Training / Module 7
MODULE 7 ORS-Approved Training Simulation · Authorised Personnel Only

Mission Control:
Emergency Retrieval

A fully compliant orbital debris retrieval simulation. Regulatory interruptions are mandatory. Fuel is managed through petty cash. OCELOT is offline. Six missions are available. You will not be told which one you are on. Proceed when ready.

REFTRN-2026-007
VEHICLEORC-V2 “REG”
MISSIONS6 AVAILABLE
INTERRUPTIONSMANDATORY
OCELOTOFFLINE
REPORTC. MORRISON
NOT FOR EXTERNAL DISTRIBUTION · ORS-APPROVED
VEHICLE
ORC-V2 REG
PETTY CASH ALLOCATION
100%
OCELOT STATUS
ATTEMPT #1,416 · FAILED
MISSION TIMER
00:00
■ MISSION LOG · LIVE
ORC SYSTEM NOTIFICATION
Notification
ORC ORBITAL RECOVERY CREW · TRAINING MODULE 7
MISSION CONTROL:
EMERGENCY RETRIEVAL
Pilot ORC-V2 “Reg” through the debris field. Retrieve the designated target object. Return to base. Try not to run out of fuel.

Regulatory interruptions will occur. They are mandatory. This is not optional. L. Sandhu has confirmed this in writing.
ARROW KEYS or WASD · MOVE  |  COLLECT: fly over debris  |  RETURN TO BASE when target is retrieved
● ARROW KEYS / WASD — MOVE    ● FLY OVER DEBRIS TO COLLECT
OBJECTIVE: RETRIEVE TARGET OBJECT — RETURN TO BASE
01 / MISSIONS

Available missions

Six missions are available in the simulation. Mission selection occurs at the start screen. Each mission is based on an actual ORC operational scenario. P. Patel has confirmed this. P. Patel has also noted that the simulation is “simplified but directionally correct.” C. Morrison will file a report regardless of which mission you complete.

MISSION ORC-2025-001
LEO

Standard Retrieval

Single object. Stable orbit. Standard approach corridor registered. Three to five regulatory interruptions expected. This is the one P. Patel describes as “the straightforward one.” It is not straightforward.

DIFFICULTY: STANDARD · INTERRUPTIONS: 3–5 · VEHICLE: ORC-V2 REG
MISSION ORC-2025-002
EXPRESS

Express Retrieval

The client has called more than twice. Timeline accelerated. Fuel reserves reduced to reflect the expedited launch window. Seven regulatory interruptions minimum. The ORS does not expedite. L. Sandhu has confirmed this.

DIFFICULTY: ELEVATED · INTERRUPTIONS: 7–9 · FUEL: REDUCED
MISSION ORC-2025-003
BULK

Bulk Clearance

Multiple objects. One invoice. The client does not know how many objects there are. ORC knows. ORC has counted. ORC is not telling the client until the report is filed. C. Morrison is already drafting it.

DIFFICULTY: COMPLEX · OBJECTS: MULTIPLE · DOCUMENTATION: AGGREGATE
MISSION ORC-2025-004
DISPUTED

Sector Dispute

A rival operator is present in the approach corridor. L. Sandhu is aware. L. Sandhu has submitted a formal sector agreement complaint to the ORS. The ORS has acknowledged receipt. ORC is proceeding on the basis that the sector is ours. It is.

DIFFICULTY: ELEVATED · RIVAL OPERATOR: PRESENT · L. SANDHU: MONITORING
MISSION ORC-2025-005
HIGH-ALTITUDE

MEO Retrieval

Medium Earth Orbit. Fuel budget is 78% and Finance has already submitted a formal query. P. Patel’s plan is version 9. The inclination change alone is significant. Finance has been sent the delta-V calculation. Finance has said they will look at it.

DIFFICULTY: HIGH · ALTITUDE: MEO · FUEL: 78% ALLOCATION · FINANCE: QUERIED
MISSION ORC-2025-006
CLASSIFIED

Classification-Pending Object

The object’s classification status is pending. Approach is technically permitted under the training simulation. In real operations it would not be. L. Sandhu has confirmed this distinction is important. This note was L. Sandhu’s idea.

DIFFICULTY: EXTREME · CLASSIFICATION: PENDING · L. SANDHU: HAS NOTED THE IRONY
NOTE · P. PATEL, LEAD MISSION PLANNER  The simulation uses real orbital mechanics for fuel calculations. Delta-V budgets are based on Hohmann transfer assumptions from a 400km parking orbit. The fuel percentages are correct in principle. Interruption timing is based on actual ORS notification patterns from 2023–2025. L. Sandhu provided the interruption frequency data. L. Sandhu found this straightforward.
02 / CONTROLS

Controls reference

InputActionNote
↑ / WThrust forwardFuel is consumed. Finance is watching.
↓ / SReverse thrustAlso consumes fuel. Finance is still watching.
← / ATurn leftRotational only. No fuel cost.
→ / DTurn rightRotational only. No fuel cost.
Fly overCollect debrisMust be designated target to score. Others are distractions.
Return baseComplete missionOnly valid after target is retrieved. The base is the large object.
InterruptionStop everythingMandatory. Cannot be dismissed quickly. L. Sandhu designed this.
SCORING

How performance is assessed

FactorWeightDetail
Objects retrievedPrimaryRetrieving the designated target is the mission objective. All other collection is incidental.
Fuel remainingSignificantFuel is tracked as a percentage of petty cash allocation. Finance notes anything above 75%.
Mission durationModerateP. Patel’s plan has a notional window. Exceeding it adds a note to C. Morrison’s report.
Regulatory complianceMandatoryInterruptions are coded in. Compliance is automatic. Non-compliance is not possible. L. Sandhu confirmed this.
Client ratingVariableGenerated at mission end. Clients rate 1–5 stars. Some clients cannot explain their rating. ORC has also noted this.
SCORING NOTE · C. MORRISON  A mission report is generated at mission conclusion. C. Morrison will require at least one revision. The first draft will be thorough. The second draft will be more thorough. This is C. Morrison’s process.
03 / PAPERWORK

Regulatory interruption minigames

When a regulatory interruption occurs during a mission, operations must stop. The interruption takes one of three forms. All three are based on actual ORC regulatory procedures. L. Sandhu designed all three. L. Sandhu has said they are “an accurate representation of the administrative burden.”

01

Form Matching

Match the correct crew member to the correct regulatory form. Forms include ORC-017C (approach corridor), ORC-088 (outstanding since 2019), and several that T. Davies is currently looking for. Matching the wrong crew member resets the form. L. Sandhu has said this is realistic.

02

Approval Chain

Route the approval through all five signatories in the correct order. The order is: T. Davies → P. Patel → L. Sandhu → M. Hargreaves → C. Morrison. An error resets the chain. L. Sandhu has a laminated diagram. The simulation also has it.

03

Redaction Exercise

Identify and redact sensitive operational data from a document before it can be transmitted. This is a real ORC procedure. L. Sandhu introduced it following an incident in 2022. The incident is in the incident register. It is referenced in the incident register. That is all that can be said about it here.

04 / CONTEXT

Simulation notes

This simulation is based on actual ORC mission parameters. Interruptions reflect real operational conditions. Fuel allocations are calibrated to P. Patel’s planning model. The orbital mechanics are simplified but directionally correct.

The debris field is procedurally generated but draws from the SSN public catalog for object classifications. All debris types represented in the simulation are real categories. The simulation does not use real orbital positions. The debris would not be in those positions. Space is large.

ORC-V2 “Reg” is the simulation vehicle. Reg’s fuel capacity is 3,800L. The simulation uses a percentage model as the exact litre cost per manoeuvre is commercially sensitive. Finance has asked for the exact figures. P. Patel has redirected Finance to the training module. This is the training module.

NOT IN SCOPE

What this module does not cover

GEO operations

GEO retrieval requires a minimum 6-month planning window. A real-time simulation of GEO operations would take six months. We have not built a six-month simulation. Module 7 covers LEO and MEO. GEO is covered in Module 1, Section 4.2, by reference only.

The 2017 object

The 2017 object is classification-pending. Approach is prohibited in real operations. Mission ORC-2025-006 in the simulation involves a classification-pending object for training purposes only. This does not apply to the 2017 object. L. Sandhu has specifically asked that this be stated here. It is stated here.

OCELOT integration

The simulation would normally interface with OCELOT for mission registration and regulatory submission. OCELOT is offline. The HUD’s OCELOT status indicator reflects actual status. It is not decorative. T. Davies has noted this.