Crew Profile Update: C. Morrison

ORC-NEWS-2024-009 · PUBLISHED 18 JUNE 2024 · PROFILE UPDATE
ORC-NEWS-2024-009 · PUBLISHED 18 JUNE 2024 · PROFILE UPDATE
Crew Profile Update: C. Morrison
Reports · Joined 2018 · 847 reports filed · 612 approved final · 1 currently in progress · Will be ready when it is ready
Role
Reports
Reports filed
847
Approved final
612
In progress
235 (various stages)
ANNOUNCED BY: C. MORRISON · APPROVED: N. OSEI · L. SANDHU: NOTED · M. HARGREAVES: REVIEWING SOMETHING UNRELATED
01 / PROFILE UPDATEAPPROVED N. OSEI

C. Morrison (Reports) joined ORC in 2018. He has been with ORC for six years. He is responsible for the production of all mission reports, incident summaries, dispatch records, and associated documentation. He describes his role as “making sure the work is properly documented.” ORC agrees with this description.

C. Morrison has updated his professional profile. He requested this announcement. It has been approved by N. Osei. L. Sandhu has noted the approval.

02 / CAREER STATISTICSVERIFIED BY C. MORRISON
847
REPORTS FILED
Since joining, 2018
612
MARKED FINAL
Approved by N. Osei
235
IN PROGRESS
Various approval stages
RoleReports
Joined2018
Reports filed847
Reports approved final612 (72.3%)
Reports in draft74
Reports pending M. Hargreaves review161
Average time to final approvalNot disclosed
Current reportIn progress. Will be ready when it is ready.
Fastest report turnaround4.5 hours (mission ORC-2021-044, circumstances atypical)
Longest report in progressC. Morrison prefers not to say

C. Morrison has been involved in the development of ORC’s standard report format since 2019. The format has gone through eleven revisions. C. Morrison was responsible for revisions 3, 5, 7, 8, 9, 10, and 11. Revisions 3 and 8 were significant. Revision 8 introduced the mandatory P. Patel fuel note. Revision 11 introduced the M. Hargreaves review stage. C. Morrison did not suggest revision 11. He has noted this.

C. Morrison is currently working on a report. He would like it noted that the report will be ready when it is ready. He acknowledges that he has said this before. He does not consider this a problem.

The ORC mission report generator is reproduced below in an interactive format. All reports produced here carry C. Morrison’s standard footer. Approval status will be as expected.

ORC MISSION REPORT GENERATOR · STANDARD FORMAT REV. 11 · C. MORRISON
ORC MISSION REPORT · · DRAFT V
Mission ref
Object class
Orbital regime
Duration
Lead technician
Outcome
P. Patel note
Additional notes
Filed byC. Morrison, Reports
Filed
DRAFT STATUSV — First draft
P. PATELFuel note appended
N. OSEIPending review
M. HARGREAVESReviewing
L. SANDHUNoted
NOTE ON STATISTICS The 235 reports not yet marked final are at various stages of the approval process. 74 are in draft with C. Morrison. 161 are with M. Hargreaves. M. Hargreaves is reviewing them. M. Hargreaves has been reviewing them for varying periods of time. C. Morrison does not consider this to reflect on the quality of the reports.
END OF REPORT · ORC-NEWS-2024-009 · C. MORRISON: FINE · CURRENT REPORT: IN PROGRESS · ETA: TBC · ORS/L/2011/0042

Similar Posts