The Mission Was Successful. C. Morrison Wrote This Report Four Times.
ORC-V2 “Reg” completed a standard S-01 LEO retrieval at 499 km on behalf of a commercial operator. NOTE D1 The object was at the stated altitude and mass. Attitude state was as characterised. Capture was completed on day 14. Re-entry was confirmed on 18 February 2026 over the South Pacific uninhabited zone. NOTE D2 Full chain-of-custody documentation was issued within 14 working days. The mission was successful in all respects.
The client received post-mission confirmation at 14:32 on 18 February. NOTE D1 The client acknowledged receipt and noted the documentation was “comprehensive.” ORC considers this the correct outcome.
The object was located at the stated position within the approach window. NOTE D3 P. Patel confirmed nominal approach parameters. Capture was achieved on the first attempt, which P. Patel noted was “as expected.” The deorbit burn was calculated by Dr. Chen and executed without anomaly. Reg returned to Hangar 7 on 20 February following mission completion. NOTE D2
No anomalies were recorded during the mission. NOTE D1 Mission log entries were filed as standard. The client contact called once during the mission, on day 8, to confirm the update schedule was still active. A. Kowalski confirmed the schedule was active. The call lasted three minutes. NOTE D4
This section was not in drafts 1, 2, or 3. It was added at M. Hargreaves’ suggestion following a conversation about why ORC-2026-042 had taken four drafts when the mission was, operationally, unremarkable. NOTE MH
The difficulty with a successful, uneventful mission is that there is nothing to describe except the success and the absence of events. The object was there. We retrieved it. It is no longer there. The client is satisfied. There are 1,847 entries in ORC’s operational records, and some of them look like this one, and some of them look like ORC-2024-338, and writing them requires different things. NOTE D3
I have written 23 mission reports for ORC since joining in 2022. Fourteen of them were successful and uneventful. I found all fourteen difficult to write. I do not find the others easy to write, but they are easier to write than the fourteen. I am not sure what this says about anything. NOTE D4 I think it is probably fine. The mission was successful. That is the report.
| Service tier | S-01 Standard Retrieval |
| Vehicle | ORC-V2 “Reg” |
| Altitude | LEO · 499 km |
| Mission duration | 18 days |
| Anomalies | 0 |
| Client contacts during mission | 1 · day 8 · 3 minutes · schedule confirmation |
| Report drafts | 4 |
| Drafts approved | 1 (draft 4) |
| Draft 1 fate | Not approved. The word “triumphantly” featured. |
| C. Morrison: currently | Filing ORC-2026-061. Draft 2. Going well, he says. |
